AfterBefore Thornhill, Vaughan
cream glazed cabinets sprayed Oxford White, gold bar pulls.
- Oxford White (CC-30), 20% sheen.
- 2K polyurethane primer and top coat, sprayed.
- 34 doors and 27 drawers.
Kitchen Made New · Our work
Real kitchens we finished, how we did them, and what to expect in your own home.
Project 91 · Thornhill, Vaughan. Tap a dot to see what's there.
Service 01 of 03
We keep your doors and spray them a new colour, and we spray the boxes and frames to match.
AfterBefore cream glazed cabinets sprayed Oxford White, gold bar pulls.
AfterBefore dark cherry sprayed Boothbay Gray, island extended with new cabinets, brushed nickel pulls.
AfterBefore dark cherry sprayed Oxford White, matte black bar pulls, new dark countertops and backsplash arranged.
AfterBefore golden oak sprayed charcoal.
AfterBefore honey oak refinished light grey, counters and backsplash kept.
AfterBefore dark espresso kitchen and vanity sprayed Balboa Mist.
AfterBefore espresso sprayed a light green, new handles, cabinets only.
AfterBefore espresso sprayed Natural Cream, island cabinets built, new counters.
Walkthrough · 44 sec
Cream cabinets with a brown glaze, sprayed a clean Oxford White, with new gold bar pulls.
Service 02 of 03
We make new doors and drawer fronts to measure, and spray your boxes and frames to match them.
AfterBefore espresso thermofoil to Cashmere Grey, refaced and sprayed to match.
AfterBefore dated cream doors replaced, boxes sprayed white.
AfterBefore oak to two-tone shaker, new quartz.
AfterBefore maple refaced in white MDF, two new boxes built.
AfterBefore espresso to white shaker, granite kept.
AfterBefore uppers repainted, new lower doors cut to match.
Walkthrough · 25 sec
The doors came in a colour no paint chart sells. Everything that stayed was sprayed to match them.
Service 03 of 03
For natural wood. We strip the wood back, stain it and seal it with a clear 2K coat, so the grain still shows.
AfterBefore refinished throughout to match its own glazed finish, new waterproof MDF under the sink.
AfterBefore stripped to bare timber, restained dark.
AfterBefore worn finish stripped back, same doors restained.
AfterBefore golden oak stripped and restained dark.
AfterBefore black island worn through, recoated in the same colour.
Walkthrough · 65 sec
The colour is the one it already had. Matching it was the whole job.
Project 91, Thornhill, Vaughan. Drag the handle to see August and October. Same desk, same floor, same room.
OctoberAugust What gets sprayed where, and what your week looks like.
The booth controls heat, humidity and dust, so the parts you touch most get the smoothest finish.

These parts stay fixed to your walls, so we spray them in place behind zipper walls and plastic, with HEPA filters and fans running.

Day 1
We remove every door, drawer front and loose panel and take them to our booth. You pick your colour from real painted chips.
Weeks 1 and 2
You can cook and use everything, just without doors. In the booth we prime, spray two top coats and sand between every coat.
Week 3, day 1
Zipper walls and plastic close it off from the rest of the house. We cover the counters, floor and appliances, and set up HEPA filters and fans.
Week 3, days 2 to 5
We clean and sand the boxes and frames, then spray the same 2K primer and top coats as the doors. The finish is solvent based, so please stay out of the house on the 2 to 3 spraying days.
Week 3, days 6 and 7
We hang every door and drawer, fit your handles and adjust each one. Then we clean up and open every cabinet with you. You can use the kitchen that evening.
For refacing, your new doors are made to measure first. Your kitchen works as normal for those 4 weeks, then the same five days follow.
Call or text Nick. He can talk you through any of these projects.
Free in-home consultation · no obligation
Refaced. Repainted. Refinished.